SOLAR PARK - MARIANA PROJECT

The solar park of the Mariana Project, developed by Ganfeng Lithium in the Llullaillaco Salt Flat (Argentina), is a 120 MW photovoltaic plant designed as an off-grid system with battery backup, allowing it to operate autonomously to supply clean and continuous energy to the lithium extraction project. In this important initiative, SUMP played a key role in driving the structure piling, mounting the solar modules, and electrical connection, tasks that were carried out with high standards of quality, safety, and efficiency, contributing to the success of one of the most significant solar installations in the mining sector of the region.

Our Company

SAMJIN - GÜEMES INDUSTRIAL PARK

We provided a team of 15 specialists in piping and welding. This group was key in performing specific tasks related to the installation and maintenance of industrial systems, ensuring both technical precision and safety at each stage of the project. Our intervention allowed Samjin to efficiently advance in the startup of their operations within the industrial park.

Our Company

POWERCHINA - MARIANA SOLAR

In the Mariana Solar Project, led by PowerChina, our company currently manages a team of 13 specialists in solar panel assembly. This team collaborates with other contractors in essential activities such as the driving process and the installation of pedestals for the panels. Among the roles we perform are grinders, machinery mechanics, and crew pointers, who work together to ensure continuous progress in this important renewable energy project, which represents a significant step towards energy sustainability in the region.

Our Company

LMA GANFEG LITHIUM - MARIANA PROJECT

As part of the Mariana Project development, our company managed a peak workforce of 350 employees, who played a fundamental role in machinery assembly tasks for this ambitious mining venture. We coordinated highly specialized teams in key areas such as piping, welding, connections, structural assembly, and work at heights. These teams worked in perfect synchronization to ensure compliance with established deadlines and required quality standards, directly contributing to the progress of one of the most relevant lithium projects in the region.